Morning Notes

Car drives through standing water in Pentagon City

Water Change Underway — The annual, temporary switch from chloramine to chlorine as the tap water disinfectant is beginning, as part of a flush of the water system. During this time, Arlington residents may notice a change in the taste and smell of their drinking water. The water system’s “spring cleaning” is scheduled to run through April 29. [Arlington County]

Ballston Garage to Get $3.5 Million in Repairs — The Arlington County Board on Saturday awarded a contract of up to $3.5 million for structural repairs to the eighth level of the Ballston Public Parking Garage. The eighth level of the garage was added in 2006, but the concrete was found to be deficient for long-term use — prompting claims that resulted in the county settling with the original contractor for an undisclosed sum. Kettler Capitals Iceplex, which is located on the top level of the garage, will remain open during the construction, which is expected to take 5-6 months. [Sun Gazette]

Spring Yard Waste Collection Begins — Arlington’s annual spring yard waste collection began Monday. During the collection, which runs through April 26, residents can get paper bags full of yard waste picked up during their regular trash collection day. [Arlington County]

Pentagon Row Ice Rink Closes — Yesterday (Monday) was the last day of the season for ice skating at Pentagon Row. The Pentagon Row ice rink is now being dismantled. Skating is expected to resume in November. [Pentagon Row]

Federal News Network Logo
Log in to your WTOP account for notifications and alerts customized for you.

Sign up